Skip to content
concrete-1840731_1920

Benefit Calculator

Disclaimer: All calculations are based on estimates and typical industry experience. Actual results may vary depending on project conditions.

Click here to switch to the Europe metrics calculator


1.
2.
100000 ft²
8000 ft² 270000 ft²
3.

Effective time the formwork stands before removal 

3 days
1 days 25 days
Your savings by using TEMO Temperature and Maturity Monitoring
 Reduction in formwork standing time:
 
day(s)
Formwork rental cost savings:
 
$

 

 

Curious?

We will present the solution to you in a 20-minute online demo without any obligation.