HS2 A46 Bypass Bridge Installation overview

Smart Monitoring Technology Supports Rapid HS2 Bridge Installation

HS2 - A46 Kenilworth Bypass Box Structure
(Warkwickshire, England)

icon-customer-s
Customer

Balfour Beatty Vinci (BBV) HS2 JV

icon-location-s
Location

 Warkwickshire, England

icon-category-s1
Project type
Infrastructure, Bridge / Tunnel Box Slide
Warkwickshire, England

HS2 - A46 Bypass Bridge Installation

In a remarkable feat of engineering and coordination, the A46 Bypass Bridge near Kenilworth was installed in just 18 days as part of the UK’s High Speed 2 (HS2) programme. The project, led by Balfour Beatty VINCI (BBV), demonstrates how innovation and collaboration can overcome complex construction challenges, especially when time, safety, and precision are critical.

Project Description

The A46 is a vital transport corridor linking Coventry, Kenilworth, and Leamington Spa to the M40. To minimise disruption to road users, the 14,500-tonne, 4,300-cubic-metre concrete box structure was built offline and then slid into place across a newly excavated section of the highway.

Challenge

Once positioned, the structure required approximately 400 cubic metres of concrete infill on either side to secure it. However, the design, featuring tall, enclosed voids and no direct line of sight, posed a significant challenge: how to ensure complete and accurate concrete placement without the ability to visually inspect the pour.

Solution

To address this, the project team turned to a real-time monitoring solution developed in collaboration with PERI UK and Vemaventuri. Using 24 PHONO sensors connected wirelessly to a central hub and cloud platform, the team was able to track the flow of self-compacting concrete live on site. This allowed them to confirm full coverage, switch pump lines as needed, and maintain the required rate of rise, approximately 0.9 metres per hour, across a three-day pour involving more than 800 cubic metres of material.

Results

The result was a flawless installation completed ahead of schedule, with minimal disruption to the public and a validated digital record of the concrete placement, supporting both structural integrity and long-term compliance.

This project not only marks a milestone in the HS2 programme but also sets a new benchmark for how smart construction technologies can enhance safety, efficiency, and quality in infrastructure delivery.

200220_022_TRIIIPLE_Wien_A_mz_hr
Lorem Ipsum
BobBaumeister
Allgemein:
  • 11,75 m Fassadenstützen in SB 4 Sichtbetonqualität
    aus Weißbeton
  •  
Herausforderungen: 
  • individuelle Sonderschalungslösungen
  • Unterstützung und Schulung des Baustellenpersonals bei der Umsetzung der komplexen Geometrien und Formen 
  • Termingerechte Materialbreitstellung und Koordination der Liefertermine

“The PERI/Vemaventuri void sensors proved to be an invaluable addition to our quality assurance and control processes during the A46 bridge slide and associated pours. They gave us the confidence, control, and traceability needed for a critical and complex operation.”

Maurice DowlingWorks Manager at Balfour Beatty VINCI