Significant acceleration of concreting

Regent Street (Leeds, UK)
icon-customer-s
Customer

CIDON Construction

icon-location-s
Location
Leeds, UK
icon-category-s1
Project type
Infrastructure | Bridge
icon-product-in-use-s1
Product
PREMO Concrete Pressure Monitoring
Even with hot water mixes the theoretical rate of rise was 180mm per hour. Working with PERI we were able to monitor the pressure from the very start and were quickly reaching a pour rate of 615mm per hour, without coming close to the pressure limits of the formwork. The maximum pressure was 36kPa on a 50kPa shutter – we could then maximize our loads per hour, finishing the pour in 9.5 hours rather than the theoretical 32.5 hours. We will be using the system again.
24-07-2023_13-17-01
Dave RobinsonCivils Operations Manager, CIDON Construction ​
Leeds, UK

Regent Street

Description

The project is a major refurbishment of two concrete bridges along a busy arterial route in Leeds city centre.

 

Challenges

The challenge  was a bridge abutment measuring 6.5 meters in height and 2 meters in width, which had to be delivered in the unforgiving winter of the North of England. The critical factor that demanded utmost attention during the concreting endeavor was the rate of rise.

 

Solution and results

Cidon Construction relied on the PREMO pressure sensor for a one-sided, 6 m high concrete pour on the south-eastern abutment wall. Due to the required surface finish, no through sleepers could be used, which added to the challenge. The use of the pressure sensors helped to precisely determine the optimal concreting speed and to prevent overloading of the formwork, thus increasing safety.

200220_022_TRIIIPLE_Wien_A_mz_hr
Lorem Ipsum
BobBaumeister
Allgemein:
  • 11,75 m Fassadenstützen in SB 4 Sichtbetonqualität
    aus Weißbeton
  •  
Herausforderungen: 
  • individuelle Sonderschalungslösungen
  • Unterstützung und Schulung des Baustellenpersonals bei der Umsetzung der komplexen Geometrien und Formen 
  • Termingerechte Materialbreitstellung und Koordination der Liefertermine

RegentStreetFlyover1
RegentStreetFlyover4
RegentStreetFlyover2
regent-street-004

Curious?

We will present the solution to you in a 20-minute online demo without any obligation.